Complex projects

Where energy, computing and food share one site.

Our flagship Power Greenhouse + data-center complex turns sunlight into electricity, computing into heat, and heat back into food — a circular system designed for the Alberta prairie.

The circular model

A closed energy & heat loop.

Power Glass greenhouses generate clean electricity and grow crops. Most of that power runs an on-site data center; the data center's waste heat is captured and returned to the greenhouses to keep them warm through Alberta winters. Nothing is wasted.

  • 75%of power supplies the data center
  • 45%of greenhouse heat from waste heat
  • 100 MWgreenhouse generation
  • 300 MWenergy storage
Energy and heat loop
Flagship complex

160 acres of integrated infrastructure.

160 ac

Total site area.

100 MW

Power Glass greenhouse generation.

10 MW

On-site data-center capacity.

~5 yr

Projected payback period.

Complex aerial view Power greenhouse complex
Pilot complex
Pilot — 1/20 scale

Start with a proof-of-concept AI point.

Before the full build, we deploy a 1/20-scale pilot that proves the model end-to-end: generation, storage, computing and heat recovery working together. It can be built in about ten months.

  • 5 MWgreenhouse generation
  • 15 MWenergy storage
  • 0.5 MWdata center (AI point)
  • ~10 motime to complete

Exploring a large-scale energy + agriculture project?

We work with developers, investors and institutions on feasibility, modelling and pilot deployment. Let's talk.

Discuss a complex project